PRODUCT

New energy system

Current location:Home > Product > New energy system

Electronic control unit assembly and test system


Product introduction


The assembly of ECU products in the whole production line requires the following actions:

1. sealing the Base plate

2. Base plate sealant-coated CCD detection

3. Assemble the Base plate and Power module lock screws

4. PCB is fitted and assembled with Base plate

5. Ultrasonic welding of PCB and Power module

6. Finished product sealant coating machine drying after assembly


Tianyong Engineering(Shanghai) Co.,Ltd

TEL:021-50676618

FAX:021-50675578

Add: No. 500 Huixian Road, Jiading ,Shanghai


Tianyong Engineering(Shanghai) Co.,Ltd    ICP filing:沪ICP备16029615号-1    Technical support:35 Interconnection
Baidu
sogou